Towering Wishes and Dwellers Dreams In cities like Mumbai, redevelopment is booming. >> To obtain certificate of BMC for water connection to main water line of C. H. >> To obtain certificate for TDR from the Govt. The following main stages of redevelopment need to be noted: >> The consent letter of members of the CHS. >> Re-shifting of members on receipt of CC The Managing Committee is expected to study and follow these guidelines and get the project completed successfully. 6. Before calling a Special General Body Meeting, the committee has to invite tenders from at least five to six well known experts from the building field and to select one such expert to attend the Special General Body Meeting. Presence of members in such an SGM meeting, shall not be less than 75 per cent of total members. >> To obtain OC/CC. >> Demolition of old structure. >> To obtain all necessary certificates/NOCs essential for redevelopment work. >> To get surveyed land to be redeveloped. If this quorum is not formed, the meeting shall stand adjourned for one week. A video shooting of this meeting is required. The proceedings of this meeting should be circulated to all members for their information and after two weeks of the meeting, appointment letters of the architect along with the PMC shall be issued, informing therein about terms and conditions of their jobs. >> Terms and conditions of members of the CHS. >> To obtain N. >> To obtain NOC from the Hydraulic Engineer. >> To obtain NOC from the Property Tax Authority of Municipal Corporation, Greater Mumbai. |
Friday, 2 March 2012
Towering Wishes and Dwellers Dreams
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment